Originally built in 1994, Fire Station No. 2 is 5,583 SF and was originally designed to accommodate 6 firefighters; it now has the capacity for 7 firefighters. Cooper GC was selected to renovate the fire station, and the renovation scope of work including the following:
- Improved parking accessibility and building access
- New flooring in the kitchen, laundry, dining, vestibule, watch room and hallway areas
- New flooring, wall tile, paint and accessories in the restroom/shower areas
- Replaced the exterior finish of the building
- Installed new roof, gutters and down spouts
- Replaced the sectional bay doors in the apparatus bays
- Installed a new HVAC system
- Installed a new apparatus bay ventilation system
The new 4,978 SF remote building behind Fire Station 2 serves as a support services building to house reserve fire apparatus, storage, and equipment for the Community Emergency Response Team (CERT) volunteers.
Station 2 remained operational throughout the entire project.