Originally built in 1994, Fire Station No. 3 is 5,520 SF and is designed to accommodate 6 firefighters. Cooper GC was selected to renovate the fire station, and the scope of work including:
- Improved parking accessibility and building access
- New flooring in the kitchen, laundry, dining, vestibule, watch room and hallway areas
- New flooring, wall tile, paint and accessories in the restroom/shower areas
- Replaced the exterior finish of the building
- Installed new roof, gutters and down spouts
- Replaced the sectional bay doors in the apparatus bays
- Installed a new HVAC system
- Installed a new apparatus bay ventilation system
Station 3 remained operational throughout the renovation.